The InnerWireless deployment process is built on InnerWireless’ decade-long
experience in deploying in-building wireless systems. Our approach is designed
to provide the highest quality design, installation and operations of any in-building
system on the market today and is managed through six critical phases:

Phase 1 – Scope
During the scope phase, the InnerWireless team will meet with the key customer stakeholders
(IT, facilities, telecom, clinical, bio-med, etc.) and insure all wireless and building requirements
are known such items as coverage areas, services desired by floor, aesthetics concerns, building changes, capacity, etc.
Phase 2 – Site Survey
The InnerWireless team will perform a detailed site survey from a mechanical and construction
viewpoint and will determine the RF characteristics of the building. Key areas include:
- Telecom Room and Closets
- Risers
- Individual Floors
- Interior Walls
- Roof
- RF Testing
- Logistics
Phase 3 – System Design
InnerWireless utilizes best-in-class design standards, tools, and processes
to insure all customers’ requirements are met. InnerWireless will also works with the key
application/service providers to insure all of their design criteria are achieved in the IW design process.
Key design documents are delivered, including cabling plans and signal coverage predictions.
Phase 4 – Procurement and Logistics
After design acceptance by the customer, the InnerWireless project manager finalizes the installation
subcontract and schedules the delivery of the InnerWireless infrastructure material. InnerWireless will
have clearly defined roles and responsibilities between all parties to ensure a coordinated deployment.
Phase 5 – Installation
Prior to installation, the InnerWireless team will train and certify local 3rd party installation crews
on proven InnerWireless infrastructure installation methods and subsystem testing procedures. During the
installation phase, an InnerWireless project manager will be on site during all required times to assist
the installers with any questions or clarification regarding the installation/subsystem testing procedures
to insure a quality installation.
Phase 6 – Acceptance Testing
The installation phase will conclude with completion of the system level functional customer acceptance
test plan. The InnerWireless team will perform a full sequence of tests to ensure integrity of the
InnerWireless System. These subsystem tests include:
- Wireless Portal Insertion Loss System Testing
- Cable Quality Tests
- Riser Cable Testing
|